Method

Analysis, design, verification. In that order.

Every appointment is developed in successive technical steps, keeping the client’s requirements, the real constraints of the site and the regulatory framework consistent with one another. The order itself carries meaning.

01Preliminary analysis

Gathering of requirements and available documents, technical constraints, and definition of the scope of the appointment.

02Survey of the existing installation

Inspection of the site, the existing installations, switchboards, circuits, containment, loads and operating conditions.

03Loads and constraints

Identification of the loads, power demand, utilisation and diversity factors, and the constraints on installation and maintenance.

04Electrical sizing

Cables, current ratings, voltage drops, protective devices, breaking capacity, coordination and safety criteria.

05Design documents

Drawings, single-line diagrams, technical reports, bills of quantities, specifications, notes and installation details.

06Technical and regulatory check

Verification that the design is consistent with the standards, the intended use of the building and the real conditions of installation.

request a consultation

A method, applied to your case.

Tell me where things stand and what you need: the first step is always the analysis.